The Digital Engineering Age is Here
Buildings are getting more complicated….
10 May 2023

As are the systems that operate it, which calls for design software, that can make the final vision clearer before it has been built. Revit can be used to design the mechanical services. By designing in 3D, MEP engineering services can be coordinated properly, before going on to site.
Advantages

On high-rise buildings, being able to deceased the ceiling services voids by 5cm per floor, can result in a whole extra floor of real estate.

More opportunities for modular construction – bathroom pods, pre-fab utility cupboards and services voids.

Installers will spend less time on site coordinating services.
Prefabrication Construction Methodologies
We promote the use of eco-friendly technologies, to reduce the carbon footprint of the development, which includes pre-manufactured assemblies to reduce waste and modular construction to reduce time. These units can be premanufactured and commissioned offsite, creating efficiencies on time being spent on site, installing the main functional equipment.

Utility Cupboards
The functional hub to any new-build apartment with items such as the washing machine, heating unit, ventilation unit, fuse board, internet hub, audio visual boxes, fire alarm hub and all isolation points being house in one 700 x 1550mm sized unit.

Bathroom Pods
Bathrooms are another premanufactured assembly to consider in future schemes.

Corridor Assemblies
Corridor assemblies involve installing and commissioning pipework and electrical tray, offsite and then transporting onto site, to reduce overall ceiling zones and to save time on site.